Solinst 3001 Well Cap Assembly for Levelogger
SOLINST 3001 Well Cap Assembly for Levelogger 5
Locking Well Caps
A locking well cap, designed to support both 2" and 4" wells (using an Adaptor). This versatile, vented well cap is available in two configurations. The first is designed to support Solinst Levelogger Series of products, the second is designed to support Solinst Bladder Pumps and Double Valve Pumps. Solinst Locking Well Caps are convenient, durable, and suitable for numerous other applications and installation types.
Guide to Levelogger Deployment and Communication
Levelogger Well Cap Advantages
- Vented to equalize atmospheric pressure in the well
- Supports up to two Leveloggers
- Lockable, secure installation
- Eyebolt provides sturdy tie off
- Fits both 2" and 4" monitoring wells (using an Adaptor)
- Use a ⅜" Allen/hex key to remove the extra plug for additional monitoring access
- One design provides multiple equipment support
NOTE: These go into production when ordered, so usually there is a 1-2 week lead time on meters.




Description
SOLINST 3001 Well Cap Assembly for Levelogger 5
Locking Well Caps
A locking well cap, designed to support both 2" and 4" wells (using an Adaptor). This versatile, vented well cap is available in two configurations. The first is designed to support Solinst Levelogger Series of products, the second is designed to support Solinst Bladder Pumps and Double Valve Pumps. Solinst Locking Well Caps are convenient, durable, and suitable for numerous other applications and installation types.
Guide to Levelogger Deployment and Communication
Levelogger Well Cap Advantages
- Vented to equalize atmospheric pressure in the well
- Supports up to two Leveloggers
- Lockable, secure installation
- Eyebolt provides sturdy tie off
- Fits both 2" and 4" monitoring wells (using an Adaptor)
- Use a ⅜" Allen/hex key to remove the extra plug for additional monitoring access
- One design provides multiple equipment support
NOTE: These go into production when ordered, so usually there is a 1-2 week lead time on meters.













